Spreadsheet vs SaaS vs custom app: how to choose by workflow
How to choose between a spreadsheet, SaaS and a custom app: test one real workflow, check the limits of each option, then cost them over the same period.

Table of Contents
Stay with a spreadsheet as long as the workflow is short, one person looks after the file, and mistakes are still easy to find. Choose SaaS, ready-made software paid for by subscription, if your process is a common one and a product can run it. A custom app, built specifically for your business, only makes sense when neither of the first two options meets a must-have requirement.
To find out which one fits, write down one workflow your team actually runs, try it in all three options, then calculate the costs over the same period. This guide follows a stock request workflow as the example from start to finish.
A quick comparison of the three options
| Option | A good fit when | Signs it no longer fits |
|---|---|---|
| Spreadsheet | There are few users, the workflow is short, and the file has a clear owner | The file has many copies, formulas often get overwritten, the monthly summary has to be reconciled by hand |
| SaaS | Your process resembles that of similar businesses, and the team is willing to follow the product's way of working | Many steps are still done outside the product, or the features you need come only with a plan far larger than your requirements |
| Custom app | The workflow is specific to you, changes often as the business changes, or has to connect to systems you already use | The requirements are not yet clear, or nobody will manage the app once it has been built |
All three still need someone accountable, access rules and a way to check the work. A new tool does not settle who owns those three things.
Write down one workflow before looking at products
Take one task your team does routinely, then write down who starts it, what data is recorded, who checks it and what it produces. As a made-up example, a spare parts distributor has two branches that request goods from a central warehouse.
| Step | Who | Data recorded |
|---|---|---|
| 1. Create the request | Branch staff | PB-0147, Cikampek branch, code FLT-0412, quantity 24 |
| 2. Approve or reject | Branch head | Decision, name, date, reason if rejected |
| 3. Prepare the goods | Warehouse clerk | 20 shipped, the remaining 4 to follow |
| 4. Summarize the costs | Finance staff | Total value of goods per branch per month |
The normal path alone does not reflect the real work. Add three events that are bound to come up: the quantity is corrected after approval, a request is rejected, and stock runs short so the goods are only partly shipped. Ask for all three to be demonstrated, because product demos usually show only the normal path.

Before assessing tools, separate process problems from tool problems. If the branches and the warehouse do not yet use the same item codes, any application will store inconsistent data. If it is unclear who has the authority to approve, an "Approve" button does not answer that question. Both issues have to be fixed whichever option you pick.
Also record how much time the team spends on this workflow over one month. The cost calculation will use these observed figures, and they are easier to defend than estimates.
Spreadsheet limits to check
Size is rarely the first limit. Google Sheets holds up to 20 million cells or 100 MB, and a single Excel worksheet holds 1,048,576 rows (both checked on 1 November 2026). Control over the data usually becomes a problem sooner.
- Protection is not security. Google's help pages state that sheet and range protection should not be treated as a security measure, because people with access can still copy and export the contents.
- The change history is not always complete. Cell edit history in Google Sheets may not show deleted rows, formatting changes or values produced by formulas. Restoring an old version also erases the per-cell history from before that restore.
- Approval depends on habit. An "Approved" column is only a field someone fills in, so the rule on who may approve what is yours to enforce.
A spreadsheet is still worth using if those risks are acceptable. To keep it orderly, use one master file with one owner, protect the formula columns from accidental overwrites, limit who has edit access, and keep a monthly copy outside the master file.
Questions for SaaS vendors
What SaaS can do differs between products and between plans, so the answers have to come from the current plan documentation and contract. Ask the following about your workflow.
- What are the limits on users, storage and transactions, and what happens when a limit is exceeded?
- Is multi-level approval available in the plan you have in mind, or only in a higher plan?
- What is the export format, and are attachments and the approval history included in the export?
- Is there an API (an official channel through which two systems exchange data), and in which plan?
- After you cancel the subscription, for how long can the data still be downloaded?
- What are the renewal terms, and how are price increases handled?
An API alone does not prove that the integration you need can be built. Check which data it can read and write, and what its usage limits are. If data can only be moved by downloading and uploading files, record it as manual work and name who does it.
When a custom app is worth considering
A custom app is worth discussing when a must-have requirement fails the test in the next section and that requirement matters enough to the business. Examples are approval rules that differ by the value of the goods and by branch, or a connection to a legacy system that cannot be replaced. The decision does not have to cover everything either: accounting can stay in SaaS while stock requests run in a small app built for the purpose.
A custom app has its own costs after it is built, such as hosting, fixes, security updates and changing requirements. The GOV.UK technology guidance, written for UK public services, asks teams to understand the total cost of ownership and to keep the ability to choose a different path later. The same question applies to a business: if the working relationship with the vendor ends, who holds the code, the documentation and the data? Write the answer into the contract.
A prototype helps you agree on the requirements, but it proves nothing yet about an app running on real data. For an app that has not been built yet, turn the scenarios below into acceptance criteria, the written conditions that must be met before the work counts as finished.
Test all three options with the same scenarios
Use anonymized data, and ask for each role to be run under its own account so that access rights are tested too. Write down the expected result before the demo starts, then rate each scenario with one of three labels: works as is, needs adjustment, or stays manual.
| Scenario | Expected result |
|---|---|
| Cikampek staff create PB-0147 for 24 units | The request is saved with a unique number |
| Staff from another branch try to approve PB-0147 | Refused, because it is outside their authority |
| The branch head approves, then the quantity is corrected to 20 | The old value, the new value, who changed it and when are all recorded |
| The branch head rejects another request | The reason is saved and the warehouse does not process the request |
| Finance staff export the October summary | The file contains every column in use, and the totals per branch match |
Ask for the actual export file. An answer of "it can be exported" is not enough if important columns are missing or the link between a request and its shipment is lost.
Calculate costs over the same period
Custom app costs usually pile up at the start, while SaaS costs are spread over every month. So calculate the costs over at least two periods, for example 12 and 36 months, because the ranking can change. Take the rates from the quotes you have received, and count each piece of work only once.
| Component | How to fill it in | What to check |
|---|---|---|
| Subscription or licence | Rate per user × number of users × number of months | Tax, renewal terms, price increases |
| Implementation | Configuration or initial development cost | Scope, payment stages, exclusions |
| Data migration | Cost of cleaning and moving the data | Who checks the result |
| Training | Costs not already included in another component | Participants, materials, time spent supporting users |
| Maintenance | Monthly cost × number of months | Hosting, support, updates |
| Internal time | Hours per month × number of months × the hourly value you choose | How it was measured, kept separate from vendor invoices |
A spreadsheet has costs too, usually hidden in that last row. In the distributor example, suppose a month of observation records 6 hours compiling the summary, 4 hours reconciling stock discrepancies and 2 hours chasing approvals. That comes to 12 hours a month, or 144 hours over 12 months and 432 hours over 36 months. Multiply by the hourly value you set, then repeat with the estimated hours for the other options.
The value of internal time is an input to the decision, and it is not the same as cash spending. Fewer hours only count as a saving if that time actually goes to other work.
Decide in this order
Once the scenarios and costs are filled in, answer these three questions in order.
- Does the spreadsheet pass every required scenario, and is someone looking after it? If yes, stay with it and tidy up the file.
- Does a SaaS product pass every required scenario, including data export? If yes, choose SaaS.
- Is the failed requirement worth the cost of building and maintaining an app? If yes, start a custom app with a small initial scope. If not, change the process to fit the tools available.

Record the outcome in a single note: the must-have requirements, the test evidence, the shortcomings you accept, the costs with their assumptions, and who made the decision. Also decide what will trigger a review, for example a change in the approval rules, more branches, or a monthly summary the team can no longer keep up with.
If the outcome points to a custom app, bring the workflow, the test scenarios and the cost sheet when you talk to a developer about business app development, because they can prepare an estimate straight from that material.